Wireless CCTV Camera Installed all around the shop floor recording & monitoring of Operation with Displays in Supervisor’s Room and Manager (O&M)’s Room.
Installation of Flashing Road Light and Cautionary Boards at both sides of Wheel Washing Unit on VIP Road for enhanced Road Safety
French Drain maintained infront of Slag Pits for flow of quenching water from pits to make up Water Pond.
Railing to prevent fall fabricated on the Diesel Tank to prevent fall from height.
Net provided on the barricade around the water pond &life saving tube provided for enhanced safety.
Mist fan installed at slag pit entrance for fugitive dust suppression.
Mock Drill for Testing & Training of Auto-Fire Suppression System in Pot Carrier.
Platform Fabricated for Safe & Efficient Washing of Mobile Equipment.
Wheel Washing Unit has been installed for cleaning the wheels of Euclid Dumpers before they exit onto the road for dust control.
Oil Barrels stored inside the Garage have been barricaded to contain oil spillage.
Safety Walkways constructed at vital locations in the slag handling area for employee safety through elimination of man-machine interface.
The company celebrated 100 years of the Levy Group in Jamshedpur where Levy personnel were present to celebrate with HSMS employees and their families.